Contact Us
TEL: +86-760-86285650
Fax: +86-760-87804185
Address: No.18-9B, GuangYuan Road, TanZhou Town, ZhongShan City, GuangDong Province, China
Home > Knowledge > Content
Dec 16, 2017

Why open new mould to do the bottle are expensive? Maybe many of our customers have this problem, the mould material is metal, and the engineer need to grinding, sculpture and stereotypes, and the deferent material water bottle design need deferent metal to do the mould, so the process of  open mould is complicated.


Also, the quality of the mould, the level of sophistication, will make the deferent quality of the water bottle; a good mould can make a high-quality bottle.


Of course, a good mould can reduce a scrap of materials, will reduce the bottle’s cost, the customer will get cost-effective shake or bottle.


Welcome contact us to talk the mould and other questions of the water bottle.

Previous: Unit 21 stainless steel shaker and plastic shaker

Next: Unit 19 Prototype and Mould